Applications
Industries
Each application is a different equipment chain, and in each one a different factor decides the ratings.
The equipment catalogue is the same across applications. What changes is the constraint that governs the specification. In a factory it is often the starting of the largest motor. In a data centre it is the redundancy concept. On a battery or solar connection it is the reactive power the grid code asks for. Naming that constraint early saves more than any later optimisation, because it decides the rating and the rating decides nearly everything after it.
Applications
What decides the rating, by application
| Application | Typical chain | What usually decides the rating |
|---|---|---|
| Data centres | Grid, MV switchgear, transformers, LV boards, UPS | The redundancy concept and the non redundant load |
| Industrial facilities | Grid, MV switchgear, transformer, LV board, process loads | Motor starting and harmonic loads, more often than the running load |
| Commercial buildings | Grid, substation, dry type transformer, main switchboard | Diversified building load and the fire strategy |
| Utilities and infrastructure | Network, ring main unit, transformer, LV distribution | The network operator's standard |
| Renewable energy connections | Inverters or converters, transformer, MV switchgear, grid | Apparent power, including the reactive power the grid code requires |