Applications

Power equipment by application

The same transformers, switchgear, generators and UPS serve every application. What changes is the constraint that sets their ratings.

In a factory it is often the start of the largest motor. In a data centre it is the redundancy concept. On a battery or solar connection it is the reactive power the grid code asks for.

Naming that constraint early saves more than any later optimisation, because it decides the rating and the rating decides nearly everything after it.

Applications

What decides the rating, by application

ApplicationTypical chainWhat usually decides the rating
Data centresGrid, MV switchgear, transformers, generators, UPS, coolingThe redundancy concept and the non redundant load
Industrial facilitiesGrid, MV switchgear, transformer, LV board, process loadsMotor starting and harmonic loads, more often than the running load
Commercial buildingsGrid, substation, dry type transformer, main switchboardDiversified building load and the fire strategy
Utilities and infrastructureNetwork, ring main unit, transformer, LV distributionThe network operator's standard
Renewable energy connectionsInverters or converters, transformer, MV switchgear, gridApparent power, including the reactive power the grid code requires