Switchgear

Medium voltage switchgear

Metal enclosed assemblies for systems above 1 kV, configured as incomer, feeder, coupler and metering panels against the protection scheme the network requires.

At a glance

Standard
IEC 62271-200above 1 kV up to and including 52 kV
Common rated voltages
12, 17.5, 24 and 36 kVfor 10 or 11, 13.8, 20 or 22, and 33 kV systems
Construction
air, gas or solid insulated
Switching device
withdrawable or fixed circuit breakers, or switches
Internal arc
classified by type testdecides the room and where people can stand
Outline drawing for orientation.Not a photograph of a specific unit. Arrangement, enclosure and dimensions depend on the unit offered.

A medium voltage assembly is built from panels, and the panel schedule is the specification. An incomer takes the supply cable, a feeder serves each transformer or outgoing circuit, a bus coupler joins two sections where redundancy is needed, and a metering panel appears where the operator meters on the medium voltage side.

Internal arc classification is worth settling early. It is proven by type test for a tested configuration, it decides whether the room needs pressure relief and where the assembly can stand, and raising it after the room is built is rarely possible.

What gets specified

ParameterTypical optionsWhat decides it
Rated voltage12, 17.5, 24 or 36 kVThe system voltage
Rated normal currentBusbar and feeder ratings in AThe loads and transformers supplied
Short time withstand currentkA for a stated durationThe fault level at the connection point
Panel scheduleIncomers, feeders, couplers, metering, sparesThe single line diagram
Switching deviceCircuit breaker, load break switch, switch fuseThe duty of each feeder
ConstructionWithdrawable or fixed, air, gas or solid insulatedFootprint, maintenance approach and destination rules
Internal arc classificationAs proven by type testThe room and operating practice
Protection and controlRelays, instrument transformers, interlocksThe protection scheme

Typical options are the ones buyers most often specify. They are not a list of what is available, which is confirmed per enquiry.

Insulating gas and the EU F gas rules

SwitchgearPutting into operation with fluorinated gas in the insulating or breaking medium is prohibited from
Medium voltage, primary and secondary distribution, up to and including 24 kV1 January 2026
Medium voltage, primary and secondary distribution, above 24 kV up to and including 52 kV1 January 2030
High voltage, 52 kV up to and including 145 kV and up to 50 kA, gas with a global warming potential of 1 or more1 January 2028
High voltage, above 145 kV or above 50 kA, gas with a global warming potential of 1 or more1 January 2032

Regulation (EU) 2024/573, Article 13(9). The prohibition attaches to putting equipment into operation, not to when it was made, which matters for unused surplus stock. Taking switchgear out of operation in the Union and putting it into operation at another Union site is not treated as putting into operation (Article 13(10)). The regulation provides derogations tied to the outcome of a procurement procedure (Article 13(11) and 13(12)). Whether a derogation applies to a project is a question for the project, not for this page.

Applicable standards

StandardWhat it covers
IEC 62271-1Common specifications for AC switchgear and controlgear above 1000 V
IEC 62271-200AC metal enclosed switchgear and controlgear above 1 kV up to and including 52 kV, indoor and outdoor
IEC 62271-100AC circuit breakers for three phase systems above 1000 V
IEC 61936-1Power installations exceeding 1 kV AC, for the installation around the assembly
Regulation (EU) 2024/573Restrictions on fluorinated gases in new switchgear, see below

The standard that applies is set by the specification and the destination market. Editions change, so the edition cited in a specification is confirmed in the quotation.

Documents normally requested

DocumentWhat it evidences
Technical datasheet and single line diagramRatings, panel functions and the arrangement offered
General arrangement drawingFootprint, height, cable entry and floor fixings
Type test reportThe design has passed the type tests of its standard, including internal arc where claimed
Routine test reportThe individual assembly's tests before dispatch
Schematic and wiring diagramsControl, protection and interlocking circuits
Operating and maintenance manualOperation, interlocks and maintenance

An internal arc classification is only as good as the type test behind it, and it applies to the tested configuration. Ask for the report that matches the arrangement offered.

What we need to quote accurately

01Rated voltage and the system voltage it will operate on
02Rated normal current of the busbar and of each feeder
03Rated short time withstand current and duration, taken from the fault level at the connection point
04The panel schedule: incomers, feeders, couplers, metering and any spare ways
05Insulation medium preference, and any restriction on it at the destination
06Internal arc classification required, and the room the assembly will stand in
07Protection scheme, relay preference and any network operator requirement
08Quantity, destination, required delivery date and acceptable condition

Delivery and logistics

Distribution equipment is heavy, and a delivery date is only real once the site is ready for it. The dimensions and weight of the unit offered decide the vehicle, the lifting equipment and the route to the foundation, and they come from the manufacturer's drawing rather than from the rating.

Liquid immersed transformers are usually shipped filled, which affects transport rules and the handling on arrival. Anything crossing a border also carries customs documentation, and where the destination applies its own conformity or energy efficiency rules the paperwork has to match that market rather than the country of manufacture.

Lead times vary widely with rating, specification and manufacturer loading. We state a delivery basis in each quotation for the specific unit offered and do not publish a general lead time we cannot hold.

Common questions

Do you supply protection settings?

No. Protection settings are agreed with the network operator and applied by the party that carries out commissioning. We source equipment specified to accept the scheme.

Can SF6 switchgear still be supplied in the EU?

The EU F gas regulation prohibits putting into operation new medium voltage distribution switchgear up to 24 kV that uses fluorinated gas for insulation or breaking from 1 January 2026, and above 24 kV up to 52 kV from 1 January 2030, with derogations tied to the procurement outcome. We confirm the insulation medium against the destination and the project before quoting.

Related

Request a quote for this equipment

Send the rating, the voltage and the destination, or submit the specification, drawing or nameplate. Anything missing is raised before it reaches a supplier.