Industries

Equipment for utilities and infrastructure

Network equipment for distribution network operators, independent network contractors and infrastructure owners, specified to the operator's standard.

Outdoor high voltage substation with gantries and equipment behind a fence, seen across a grass field under an overcast sky
An outdoor high voltage substation, seen across a field.Photo: PtiBzh, CC0 1.0, source. Shown for illustration. Not a product of this company, and no stock or manufacturer relationship is implied.

Equipment that joins a public network is built to the network operator's standard, and many operators accept only equipment types they have assessed. For an independent network contractor building assets that an operator will adopt, the operator's specification is the specification, and a quotation that departs from it is not useful however good it looks.

We source against the operator's standard and state plainly where a proposed type has not been assessed by the operator concerned. That check belongs before a quotation, not after an order.

The equipment chain

A secondary distribution node on a cable ring.NETWORKRINGMAINUNITTRANSFORMERLVCABINETCONSUMERS
A secondary distribution node on a cable ring.

What decides the specification

The network operator's standard decides the ring main unit configuration, the transformer ratings and losses, the connection systems and often the enclosure. Where the operator keeps a list of accepted types, that list governs which equipment can be offered.

Beyond the standard, the network design decides the ratings: the ring configuration, the fault level and the load of the area served.

What to settle early

ConsiderationWhy it matters here
Operator standardGoverns the specification of adopted assets
Accepted equipment typesWhere an operator keeps a list, it decides what can be offered
Ring configurationSets the ring main unit functions
Network automationDecides motorised operation and monitoring
Pad mounted or prefabricatedFollows the network's practice
Insulating gasEU rules restrict fluorinated gas in new distribution switchgear

Equipment for this application

What we need to quote

01The network operator and its equipment standard
02Whether the asset will be adopted by the operator
03Ring main unit configuration and operation
04Transformer ratings and voltages
05Quantities and the delivery programme

Related

Send us the requirement

Send the rating, the voltage and the destination, or submit the specification, drawing or nameplate. Anything missing is raised before it reaches a supplier.