Data centre

Three phase UPS systems for critical loads

Three phase UPS systems, uninterruptible power supplies specified by rating, topology, redundancy and runtime, and put to the manufacturers whose range covers them.

Rating
kVA and kWat the load's power factor
Topology
double conversion online (VFI)IEC 62040-3 classification
Redundancy
N, N+1, 2Nset by the design
Runtime
minutes at a stated loadbridges to the generator
Battery
lithium ion or VRLAwith its room or cabinet

A data centre UPS carries the load through the seconds between a mains failure and the generator. Its runtime is therefore set by the generator's start and transfer, with margin, not by hours of autonomy.

Redundancy is a design decision and the UPS is bought to it. In N+1 the system has one module more than the load needs, so each module carries a share and the rest carry the whole load when one fails. In 2N two complete systems each carry the whole load alone, fed from separate paths.

What gets specified

ParameterTypical optionsWhat decides it
RatingkVA and kW per system or moduleThe IT load and its growth
TopologyDouble conversion online, line interactiveHow clean the output must be
RedundancyN, N+1, 2N, 2N+1The availability design
Runtime5 to 15 minutes at full load is common for data centresGenerator start and transfer time
BatteryLithium ion, VRLAFootprint, weight, cooling and life
ConstructionModular hot swap or monolithicGrowth and maintenance practice
Voltage400 V three phase in and outThe switchboard

N+1 and 2N

N+1, here N = 2: three modules, each sized for half the loadModule 150 %Module 250 %Module 350 %Load 100 %2N: two complete systems, each carrying the whole load aloneSystem A100 %System B100 %Dual corded loadUPS redundancy, schematic
Schematic. In N+1 each module is sized for the load divided by N and the others carry it when one fails; in 2N each system carries the whole load alone.

Break times under BS 7671

Where a UPS serves safety services, BS 7671 classes the supply by how long the break may last, from no break through very short (0.15 s) and short (0.5 s) to medium (15 s). The IET's guidance places a mains floating UPS in the no break class and other UPS types in the very short break class.

Hospitals set the tightest case. Section 710 of BS 7671:2018 requires theatre luminaires, endoscopy and life support equipment to change over within 0.5 s to a source that lasts at least three hours. Other listed equipment must transfer within 15 s to a source lasting at least 24 hours. The first is a UPS duty, the second a generator's.

The performance standard

StandardWhat it sets
IEC 62040-3Uninterruptible power systems: the method of specifying performance and the test requirements, behind the VFI classification

What we need to quote

  1. Load in kW and kVA, today and at full build
  2. Redundancy: N, N+1 or 2N
  3. Runtime at a stated load
  4. Battery chemistry, and where the batteries stand
  5. Modular or monolithic
  6. Input and output voltage and the switchboard
  7. Whether it serves safety services, and the break class they need