Substations

Compact substations

One prefabricated enclosure carrying the medium voltage switchgear, the transformer and the low voltage distribution, delivered as a unit and set on a prepared foundation.

At a glance

Standard
IEC 62271-202AC prefabricated substations, operating voltage up to 52 kV
Operation
from outside, or walk inthe standard covers both
Transformer
commonly in the distribution rangerating set by the load
Medium voltage
commonly a ring main unitconfiguration set by the network
Enclosure
concrete, steel or compositeset by site and specification
Prefabricated compact substation in a light concrete enclosure with dark ventilated doors, set on site with red cable ducts in the foreground
A prefabricated compact substation set on its foundation, with the cable ducts laid before delivery.Photo: Pavvel70, CC BY 4.0, source. Shown for illustration. Not a product of this company, and no stock or manufacturer relationship is implied.

A compact substation arrives complete, which moves the site work before delivery rather than after it. A prepared foundation, cable ducts in the right positions and access for the delivery vehicle and the lifting equipment are the three items that decide whether a delivery date is real.

Because the enclosure is type tested with its contents, changing the equipment inside later is not free. The rating, the ring main unit configuration and the low voltage schedule are worth fixing before the order rather than during manufacture.

What gets specified

ParameterTypical optionsWhat decides it
TransformerRating, voltage pair and constructionThe load and the network
Medium voltage switchgearRing main unit, commonly two ring switches and a transformer feederThe network arrangement at the site
Low voltage distributionIncomer rating, number and rating of outgoing waysThe loads supplied
Enclosure materialPrecast concrete, steel or compositeSite, transport and specification
OperationFrom outside through doors, or walk inOperating practice and climate
Internal arc classificationAs tested for the stationWhere people can be when the station is energised
Metering and auxiliariesMetering position, auxiliary supply, remote signallingThe network operator and the owner

Typical options are the ones buyers most often specify. They are not a list of what is available, which is confirmed per enquiry.

Applicable standards

StandardWhat it covers
IEC 62271-202AC prefabricated substations, cable connected, operating voltage up to and including 52 kV, operated from inside or outside
IEC 62271-200AC metal enclosed switchgear above 1 kV up to and including 52 kV, for the medium voltage equipment
IEC 61439-1 and IEC 61439-2Low voltage switchgear assemblies, for the low voltage board
IEC 60076-1Power transformers, general requirements

The standard that applies is set by the specification and the destination market. Editions change, so the edition cited in a specification is confirmed in the quotation.

Documents normally requested

DocumentWhat it evidences
Technical datasheet and single line diagramRatings, panel functions and the arrangement offered
General arrangement drawingFootprint, height, cable entry and floor fixings
Type test reportThe design has passed the type tests of its standard, including internal arc where claimed
Routine test reportThe individual assembly's tests before dispatch
Schematic and wiring diagramsControl, protection and interlocking circuits
Operating and maintenance manualOperation, interlocks and maintenance

An internal arc classification is only as good as the type test behind it, and it applies to the tested configuration. Ask for the report that matches the arrangement offered.

What we need to quote accurately

01Transformer rating and the primary and secondary voltage
02Medium voltage configuration: ring main unit functions or panel schedule
03Low voltage distribution: incomer rating, number and size of outgoing ways
04Enclosure type and whether it is operated from outside or from an internal aisle
05Site access for delivery and lifting, and the foundation arrangement
06Metering position and any network operator requirement
07Quantity, destination, required delivery date and acceptable condition

Delivery and logistics

Distribution equipment is heavy, and a delivery date is only real once the site is ready for it. The dimensions and weight of the unit offered decide the vehicle, the lifting equipment and the route to the foundation, and they come from the manufacturer's drawing rather than from the rating.

Liquid immersed transformers are usually shipped filled, which affects transport rules and the handling on arrival. Anything crossing a border also carries customs documentation, and where the destination applies its own conformity or energy efficiency rules the paperwork has to match that market rather than the country of manufacture.

Lead times vary widely with rating, specification and manufacturer loading. We state a delivery basis in each quotation for the specific unit offered and do not publish a general lead time we cannot hold.

Common questions

Can the transformer inside a compact station be changed later?

Physically, sometimes. But the type test covers the station with the equipment it was tested with, so a change can affect what the test evidence proves. It is cheaper to settle the rating before the order.