Generation

Industrial generators for standby and prime power

Industrial generators, diesel and gas generating sets from about 100 kVA to 3 MVA, put to the manufacturers whose range covers your duty, voltage, fuel and site, with offers that come back comparable.

Duty rating
standby, prime or continuousISO 8528-1
Rating
kVA at that dutykWe at 0.8 power factor
Voltage
400/230 V, or a medium voltage setwith frequency, 50 or 60 Hz
Fuel
diesel, HVO, natural gas, LPGset by site and permit
Installation
stationary or mobiledecides the emissions regime

A generating set is bought for a duty before it is bought for a size. A standby set runs only when the mains fails and is rated for limited hours at a varying load. A prime set is the main supply and runs as long as needed. The same engine and alternator carry a lower rating at prime than at standby, so two offers compare only at the same duty.

The load decides the rest. A data centre set picks up UPS systems and chillers in steps; a factory set starts motors. The largest single step, not the total, often sets the alternator and the governor response, so name it in the request.

Duty ratings

RatingRunning hoursLoad
Emergency standby power (ESP)Limited, typically up to 200 hours a year, for outages and testsVariable; average over 24 hours no more than 70 % of the rating
Prime power (PRP)UnlimitedVariable; average over 24 hours no more than 70 % of the rating
Continuous operating power (COP)UnlimitedConstant, at up to 100 % of the rating
Limited time running power (LTP)Up to 500 hours a yearConstant, up to the prime rating

Definitions from ISO 8528-1 as manufacturers publish them; prime power also allows a 10 % overload for one hour in twelve. Makers define standby differently, one major range allowing 500 hours a year against the 200 above, so every offer is compared on the duty it actually states.

What gets specified

ParameterTypical optionsWhat decides it
Duty and ratingESP, PRP or COP, in kVAHow the set is used and the load profile
LoadUPS, chillers, motors, mixedThe largest step and the total
Voltage and frequency400/230 V 50 Hz; 10.5 or 11 kV for medium voltage setsThe switchboard it feeds
FuelDiesel, HVO to EN 15940, natural gas, LPG, biogasSite, permit and storage
Enclosure and soundOpen in a plant room, canopy, containerLocation and the sound limit at a stated distance
Transfer and controlsATS, synchronising, grid parallelNumber of sets and the network operator
Runtime and tankHours at a stated load; base or bulk tankAutonomy required
Emissions regimeStationary or mobile; running hours; shared stackEU and national rules below

Generator ratings from 100 kVA to 3 MVA

RatingReal power at power factor 0.8Full load current at 400 VFull load current at 415 VNext step
100 kVA80 kWe144 A139 ARequest a quote
150 kVA120 kWe217 A209 ARequest a quote
200 kVA160 kWe289 A278 ARequest a quote
250 kVA200 kWe361 A348 ARequest a quote
300 kVA240 kWe433 A417 ARequest a quote
400 kVA320 kWe577 A556 ARequest a quote
500 kVA400 kWe722 A696 ARating page
630 kVA504 kWe909 A876 ARequest a quote
800 kVA640 kWe1155 A1113 ARequest a quote
1000 kVA800 kWe1443 A1391 ARequest a quote
1250 kVA1000 kWe1804 A1739 ARequest a quote
1500 kVA1200 kWe2165 A2087 ARequest a quote
2000 kVA1600 kWe2887 A2782 ARating page
2500 kVA2000 kWe3608 A3478 ARequest a quote
3000 kVA2400 kWe4330 A4174 ARequest a quote

kWe at a power factor of 0.8, the convention generating set ratings are stated at; current calculated as S / (√3 × V) and rounded to the nearest amp. A rating between two rows is quoted the same way. US buyers size sets in kW: a 200 kW set is the 250 kVA row, a 1 MW set the 1250 kVA row.

Permits in Great Britain: medium combustion plant and specified generators

In England and Wales the Environmental Permitting Regulations treat combustion plant of 1 MW to below 50 MW thermal input as medium combustion plant, whatever the fuel and however few hours it runs. Thermal input is taken on net calorific value. Plant first operated on or after 20 December 2018 needs its permit before it is commissioned. Existing plant above 5 MW has needed one since 1 January 2024, and existing plant of 1 to 5 MW needs one from 1 January 2029. At typical efficiencies, 1 MW thermal input is roughly a 500 kVA set.

Generating plant of the same size also falls under the specified generator controls. A backup set that runs only for emergencies on its own site and is tested for 50 hours a year or less is excluded from them. The Environment Agency is clear that it is still medium combustion plant and still needs its permit. Balancing services and demand side response do not count as emergency use, and testing beyond 50 hours needs the regulator's written agreement.

A new plant that runs 500 hours a year or less, as a three year rolling average, is exempt from the emission limits once a declaration is signed. Scotland moved its rules into the Environmental Authorisations (Scotland) Regulations 2018 on 1 November 2025, and Northern Ireland runs its own permit and specified generator regimes, so the site's nation belongs in the request.

Elsewhere in the EU, Directive (EU) 2015/2193 sets the same 1 to 50 MW band, and Regulation (EU) 2016/1628 covers sets mounted on mobile machinery rather than plant installed for its first use.

Transfer and control

What we need to quote

  1. Duty rating and the rating in kVA, or the load to be carried
  2. Voltage, frequency and the switchboard the set feeds
  3. The largest load step: UPS, chiller or motor start
  4. Fuel, and the runtime at a stated load
  5. Enclosure, location and any sound limit
  6. Stationary or mobile, and the expected running hours per year
  7. Whether the set will ever earn from balancing services, which ends the backup exclusion
  8. Transfer switch or synchronising, and the number of sets

Questions buyers ask

Do you supply rental or temporary power?

We source generating sets to buy. Temporary and bridge power is a rental fleet's business, and we hold no fleet, so for hire we say so and point you to the rental market rather than resell a hire contract.

Who commissions the set on site?

The manufacturer or its local service partner commissions where the offer includes it, and the offer states it. We do not install or commission. Say in the request who you expect to do it.

Can a generator request sit in the same project as transformers and switchgear?

Yes. A project request keeps each line apart, so the generators, the transformers and the switchboard each go to their own manufacturers under one project reference.

Building or expanding a facility?

Send the whole equipment schedule as one project, each item with its own requirements.

Send a project
GeneratorsRequest a quote