Procurement

Transformer replacement after a failure

Send the nameplate and the date the site needs power back. We match the replacement to the existing installation first, then set out each supply option with its condition and delivery basis.

Nameplate photograph
the whole plate, legiblerating, voltages, vector group, impedance
Photographs of the unit
front, sides and cable connectionsthey show the fittings and the connections
Date power is needed
the latest acceptable dateit decides which options are worth checking
Availability
checked per requestagainst the date you give

Daverlan starts from the nameplate. We turn it into a specification a manufacturer can quote, check which supply routes can meet your date, and tell you when none can.

What the replacement has to match

ItemWhy it mattersWhere it comes from
Rating and voltage pairA different ratio will not work on the existing network and installationThe nameplate
Vector groupIt must suit the earthing arrangement and any unit in parallelThe nameplate
ImpedanceUnits in parallel share load in proportion to it, and it sets the fault level at the boardThe nameplate or the test report
Tapping rangeThe network voltage at the connection point has to be reachableThe nameplate
Footprint, cable boxes and bushing positionsA unit that does not fit the plinth or the cables adds site workPhotographs and the site drawing
Construction and liquidThe room, the containment and the fire strategy were built for itThe nameplate and the site

What happens after the nameplate arrives

  1. Read and check

    We read the plate into a specification and ask for anything illegible or missing in the first reply.

  2. Match the installation

    We confirm each item that has to match, so every offer is for a unit that fits.

  3. Check the routes

    We ask the manufacturers whose range covers the specification whether they can build or supply a unit to it by your date.

  4. Set out the options

    You receive the options side by side, each with its condition, documents, delivery basis and validity.

Supply options and what each needs

OptionWhen it is consideredWhat has to be on file
New, built to the specificationAlwaysDatasheet, drawing, routine test report on delivery
New, from a manufacturer's short delivery rangeWhere a manufacturer publishes such units and one matchesThe same documents, and the match confirmed item by item
Surplus, unusedWhen you accept itDocuments, storage history and a test before dispatch
RefurbishedWhen you accept itThe work done, the parts replaced and the test results

Availability by your date is checked for each request and confirmed in writing.

What we need to quote a replacement

  1. Nameplate photograph, and photographs of the unit and its connections
  2. The latest date the site can accept, and whether a temporary supply exists
  3. Indoor or outdoor, ambient temperature, altitude and any corrosive or dusty exposure
  4. The standard and the loss requirement the destination market applies
  5. Quantity, destination and the date the equipment has to be on site
  6. Whether surplus or refurbished units are acceptable, or new only

Specification template

Fill it in on screen or by hand, then upload it with your request.

Questions buyers ask

How long does it take to replace a transformer?

It depends on whether a matching unit exists, on manufacturer loading if one has to be built, and on the site work. Each option we set out carries its own delivery basis.

Can you send a unit today?

No. We hold no stock. The first step is the specification from your nameplate and a check of which supply routes fit your date.

Do you install or commission the replacement?

No. A qualified contractor removes, installs, tests and commissions the unit, and the network operator handles the connection where it applies.

Replacing a failed transformerUpload a specification