Request

Send a whole project

Upload the equipment schedule once and add what you already know. Each line keeps its own requirements and goes to the manufacturers of its category, under one project reference.

Project
The tender or decision date, if there is one
As the design states it, for example 2N UPS and N+1 generators, or Tier III

Grid connection

Optional. What the connection allows and from when, if it is known.

A date or a quarter, for example Q3 2027
Schedule and documents

Upload the equipment schedule, bill of materials, tender or single line diagram as it is. We read it line by line and send you one numbered list of open points before anything goes to a manufacturer.

PDF, Excel, CSV, Word, DWG, DXF or images. Up to 5 files, 10 MB each, 15 MB in total.

Lines

Optional. State the lines you already know; each keeps its own requirements and files. A schedule upload alone is enough.

Contact