Protection and control

Circuit breakers

Medium voltage breakers that interrupt network faults and low voltage air and moulded case breakers that protect boards and feeders, including replacements for existing panels.

At a glance

Medium voltage standard
IEC 62271-100AC circuit breakers above 1000 V
Low voltage standard
IEC 60947-2circuit breakers up to 1000 V AC or 1500 V DC
Key ratings
rated current and breaking capacitybreaking capacity set by the fault level
Replacement
retrofit or like for likecompatibility with the existing panel decides
Outline drawing for orientation.Not a photograph of a specific unit. Arrangement, enclosure and dimensions depend on the unit offered.

A circuit breaker is specified by what it carries and what it must interrupt. The rated current comes from the circuit. The short circuit breaking capacity comes from the prospective fault level at the point of installation, which is why the transformer impedance and the upstream network matter to a breaker order.

At medium voltage, distribution breakers are specified by interrupting medium, vacuum or gas. Name the medium in the enquiry if the site standard requires one. At low voltage, air circuit breakers serve incomers and large feeders, and moulded case breakers serve smaller feeders. Replacing a breaker in an existing panel is its own discipline, because the new device has to fit the cradle, the interlocks and the secondary wiring of the old one, or be supplied as a retrofit designed for that panel.

What gets specified

ParameterTypical optionsWhat decides it
Voltage levelMedium voltage or low voltageThe circuit
Rated currentIn AThe load or transformer on the circuit
Short circuit breaking capacityIn kAThe prospective fault level
Interrupting technologyVacuum at medium voltage; air or moulded case at low voltageVoltage and duty
MountingFixed or withdrawableThe panel and the maintenance approach
Operating mechanism and auxiliariesSpring mechanism, motor, shunt trip, undervoltage releaseControl and interlocking
ProtectionIntegral trip unit, or an external relayVoltage level and scheme
Replacement typeNew panel, like for like, or retrofitThe existing installation

Typical options are the ones buyers most often specify. They are not a list of what is available, which is confirmed per enquiry.

Applicable standards

StandardWhat it covers
IEC 62271-100AC circuit breakers for three phase systems above 1000 V
IEC 62271-1Common specifications for AC switchgear and controlgear above 1000 V
IEC 60947-2Low voltage circuit breakers up to 1000 V AC or 1500 V DC

The standard that applies is set by the specification and the destination market. Editions change, so the edition cited in a specification is confirmed in the quotation.

Documents normally requested

DocumentWhat it evidences
Technical datasheetRatings, functions and the variant offered
Type test report or certificateThe design has passed the tests of its standard
Dimensional drawingMounting, cut out and connection positions
Wiring or connection diagramTerminals, auxiliary supply and communication
Settings and configuration filesWhere a device is supplied preconfigured
ManualInstallation, commissioning and operation

Where a device replaces an existing one, the nameplate, model and firmware of the existing device are the most useful documents to send.

What we need to quote accurately

01Device type and the system voltage it serves
02Rated current and the short circuit breaking or withstand values required
03The protection scheme and functions needed, and the scheme it must integrate with
04Auxiliary supply voltage and communication protocol
05Whether this replaces an existing device, with its nameplate or model if known
06Quantity, destination, required delivery date and acceptable condition
07For a replacement: panel manufacturer and type, and whether the breaker is fixed or withdrawable

Delivery and logistics

Devices are lighter to move than transformers and switchboards, but compatibility is the harder part of the delivery. A replacement breaker has to fit the existing panel, a relay has to fit the cut out and the scheme, and a firmware or communication mismatch can make a correct device unusable on the day.

Delivery dates are stated in each quotation for the specific item offered. We do not publish a general lead time.

Related

Request a quote for this equipment

Send the rating, the voltage and the destination, or submit the specification, drawing or nameplate. Anything missing is raised before it reaches a supplier.