Products
Switchgear suppliers for your panel schedule
Medium voltage switchgear and ring main units from the manufacturers whose published range covers your rated voltage and fault level, with offers that come back comparable.
- Rated voltage
- set by the system voltage
- Rated current
- busbar and each feederset by the loads and the transformers
- Short time withstand
- kA for a stated durationset by the fault level at the connection
- Panel schedule
- incomers, feeders, couplers, meteringthe specification itself
- Insulation medium
- air, gas or solidset by footprint and destination rules
Switchgear is specified from the network it connects to. The rated voltage, the short time withstand current and the internal arc classification all follow from the connection point. An assembly that suits one site can be unusable at the next.
Have the fault level and the network operator's requirements in hand before you ask for prices. Where they are still open, the quotation names the values it assumes, so you can check them before you order.
Switchgear types



Insulating gas and the EU F gas rules
| Switchgear | Putting into operation with fluorinated gas for insulation or breaking is prohibited from |
|---|---|
| Medium voltage, primary and secondary distribution, up to and including 24 kV | 1 January 2026 |
| Medium voltage, primary and secondary distribution, above 24 kV up to and including 52 kV | 1 January 2030 |
| High voltage, 52 kV up to and including 145 kV and up to 50 kA, gas with a global warming potential of 1 or more | 1 January 2028 |
| High voltage, above 145 kV or above 50 kA, gas with a global warming potential of 1 or more | 1 January 2032 |
Regulation (EU) 2024/573, Article 13(9). The date applies to putting into operation, whenever the switchgear was made, so it covers unused surplus units too. Switchgear taken out of operation at one Union site and put into operation at another does not count as putting into operation (Article 13(10)). Derogations tied to the outcome of a procurement procedure are set out in Article 13(11) and 13(12).
SF6 in Great Britain and Northern Ireland
The dates above are EU law, and they bind Northern Ireland, where Regulation (EU) 2024/573 applies directly. Great Britain has no ban on SF6 in new switchgear: its assimilated F gas regulation bans SF6 only in magnesium die casting and vehicle tyres, and the Defra consultation that closed in December 2025 proposed nothing on it. The government's industrial strategy says only that it will explore phasing SF6 out of network switchgear.
GB still regulates the gas in service. Most medium voltage switchgear holds less than 5 kg of SF6 and needs no leak checks, which start above 6 kg, but anyone who handles the gas needs an F gas certificate. In the EU, from 1 January 2035 SF6 may be used to service switchgear only when it is reclaimed or recycled.
Documents to expect
| Document | What it shows |
|---|---|
| Technical datasheet and single line diagram | Ratings, panel functions and the arrangement offered |
| General arrangement drawing | Footprint, height, cable entry and floor fixings |
| Type test report | The design has passed the type tests of its standard, including internal arc where claimed |
| Routine test report | The tests on the individual assembly before dispatch |
| Schematic and wiring diagrams | Control, protection and interlocking circuits |
| Operating and maintenance manual | Operation, interlocks and maintenance |
An internal arc classification covers the configuration that was type tested. Ask for the report that matches the arrangement offered.
What every switchgear request needs
- Rated voltage and the system voltage it will operate on
- Rated normal current of the busbar and of each feeder
- Rated short time withstand current and duration, taken from the fault level at the connection point
- The panel schedule: incomers, feeders, couplers, metering and any spare ways
- Insulation medium preference, and any restriction on it at the destination
- Internal arc classification required, and the room the assembly will stand in
- Protection scheme, relay preference and any network operator requirement
- Quantity, destination, required delivery date and acceptable condition
Specification template
Fill it in on screen or by hand, then upload it with your request.