Products
Transformers
Distribution, dry type, oil immersed, pad mounted and power transformers, sourced against the rating, the voltage pair, the standard and the conditions where the unit will stand.
Specified by
- Rating
- kVA or MVAnever kW, because the unit carries apparent power
- Voltage pair
- primary and secondarythe primary is set by the network at the connection point
- Construction
- liquid immersed or dry typeset by where the unit stands and whether oil is acceptable there
- Standard
- IEC or IEEEset by the specification and the destination market

A transformer is chosen by a short sequence of decisions taken in order. The rating follows from the load and from the starting behaviour of the largest motor on it. The voltage pair follows from the network on the primary side and from the installation on the secondary. The construction follows from where the unit stands. Everything after that, the enclosure, the tapping range, the fittings and the loss requirement, follows from those three.
Capacity is stated in kVA or MVA because a transformer is rated for apparent power. A load described in kilowatts has to be converted with its power factor before it can be compared with a rating, and skipping that step is one of the commonest reasons a unit arrives undersized.
Transformer types
Distribution
Choosing the construction
| Construction | Typical placement | Why it gets chosen |
|---|---|---|
| Liquid immersed, mineral oil | Outdoors, or in a dedicated transformer room | Usually lower cost per kVA, and suits outdoor installation |
| Liquid immersed, ester | Where fire safety or water protection governs | Ester liquids have a higher fire point and better biodegradability than mineral oil |
| Dry type, cast resin | Indoors, including occupied buildings | No insulating liquid, so no liquid containment and a lower fire load |
| Pad mounted | Outdoors at ground level, on North American style networks | A tamper resistant cabinet that needs no separate enclosure |
Distribution transformer ratings
| Rating | Full load current at 400 V | Full load current at 433 V |
|---|---|---|
| 100 kVA | 144 A | 133 A |
| 160 kVA | 231 A | 213 A |
| 200 kVA | 289 A | 267 A |
| 250 kVA | 361 A | 333 A |
| 315 kVA | 455 A | 420 A |
| 400 kVA | 577 A | 533 A |
| 500 kVA | 722 A | 667 A |
| 630 kVA | 909 A | 840 A |
| 800 kVA | 1155 A | 1067 A |
| 1000 kVA | 1443 A | 1333 A |
| 1250 kVA | 1804 A | 1667 A |
| 1600 kVA | 2309 A | 2133 A |
| 2000 kVA | 2887 A | 2667 A |
| 2500 kVA | 3608 A | 3333 A |
Rated current at 400 V, three phase. Each rating page covers voltage configurations, loss limits, documents and what we need to quote.
Common questions
Do you publish prices?
No, and not because they are hidden. A transformer price depends on rating, loss level, voltage pair, tapping, enclosure, standard and delivery basis. A figure without those is not a price. Every quotation states the specification it applies to.
Can you source to a North American specification as well as IEC?
A requirement written to IEEE or to IEC can be submitted. Whether a unit to that specification can be supplied to your destination is confirmed per enquiry, and we say so plainly when it cannot.
Related
Send us the requirement
Send the rating, the voltage and the destination, or submit the specification, drawing or nameplate. Anything missing is raised before it reaches a supplier.